Featured Flooring Projects
We’re proud of the work we’ve done, and our clients have been so too! Check out the many projects that we’ve completed (or at least documented) There may be more, so contact us if you’re looking for something specific.
High-Tech High
Project details: Contractor: Bycor Sq. Ft: Approx. 7,200 sq. ft. Flooring: 3rd grade Maple Commercial Flooring Pictures
Saddleback Valley Sports Center
Project details: Customer: Saddleback Valley Sports Center Sq. Ft: Approx. 24,000 sq. ft. Flooring: Maple 2nd or better System: ProAction Pro Air NR Athletic Flooring Pictures
NorthView High School
Project details: Customer: Covina Valley Unified Sq. Ft: Approx. 13,000 sq. ft. Athletic Flooring Pictures
Army Navy Academy Event Center
Project details: Customer: Army Navy Academy Contractor: Turner Construction Sq. Ft: Approx. 12,200 sq. ft. Flooring: Maple 2nd and better System: Action Pro Air AR Athletic Flooring Pictures
Cali Bamboo Office
Project details: Customer: Cali Bamboo Company Sq. Ft: Approx. 3,200 sq. ft. Flooring: Click-lock Carbonized Bamboo Commercial Flooring Pictures
Cosmopolitan Hotel
Project details: Customer: Delaware North Company Contractor: Soltek Pacific Sq. Ft: Approx. 10,800 sq. ft. Flooring: Douglas Fir Commercial Flooring Pictures
Del Theatro (La Jolla, CA)
Project details: Sq. Ft: Approx. 2,800 sq. ft. Flooring: Provenza Old World Tortoise Shell Residential Flooring Pictures
Alpine Home (Alpine, CA)
Project details: Sq. Ft: Approx. 2,800 sq. ft. Flooring: Garrison II Plus Hickory Residential Flooring Pictures
Mt Helix Residence
Project details: Sq. Ft: Approx. 2,400 sq. ft. Flooring: Elegance Hazelnut Birch Residential Flooring Pictures
Euclid Rd. (El Cajon, CA)
Project details: Sq. Ft: Approx. 2,800 sq. ft. Flooring: Cali Classic Hickory Residential Flooring Pictures
Cumberland Rd. (Poway,CA)
Project details: Sq. Ft: Approx. 1,200 sq. ft. Flooring: 7" Hand Oiled Evergreen Oak Manufacturer: Provenza Flooring Stain: Pre-finished Flooring Residential Flooring Pictures

San Diego State University: Viejas Arena (San Diego, CA)
Geary Floors Inc. has maintained a long lasting relationship with San Diego State athletics. Over the years, Geary Floors Inc. has maintained, resurfaced, and game-lined several facilities on the campus including Viejas Arena, The Student [...]

South Hills High School (West Covina, CA)
The South Hills High School project was started and completed during the summer of 2015. The approximately 12000 sq. ft. gymnasium was completely resurfaced, game lined, and refinished by Geary Floors Inc. Customer: West Covina [...]

Montgomery High School (San Diego, CA)
In 2014, Geary Floors Inc. completed a one of kind custom Boston Square Gymnasium for the Sweetwater Unified School District. The new gymnasium install included approximately 15,800 sq. ft. of 2nd btr maple, with an [...]

Coronado Fitness Center (San Diego, CA)
In January 2015, Geary Floors Inc. was contracted by RQ construction to install over 30,000 sq. ft. of maple flooring for NAVFAC Southwest. The project included a four court basketball gymnasium, dance room, and three [...]

University of San Diego: Jenny Craig Pavilion
Just before the start of the 2016 school year, Geary Floors Inc. was contracted to resurface and refinish the Jenny Craig Pavilion; home to the University of San Diego Toreos. The approximately 19000 sq. ft. [...]

University of California Santa Barbara: Robb Gymnasium
The Robertson Gymnasium is home to the UCSB Gauchos: NCAA volleyball, Men and Women’s intercollegiate sports. The project was start and completed over the January 2015 winter season. The floor features three logos and a [...]
Immanuel High School (Reedley, CA)
In early July 2015, Geary Floors first arrived at Immanuel High School to patch, resurface, and refinish the historic oak Auxiliary Gym. The project required 650 sq. ft. of subfloor and oak flooring patch work, [...]

San Diego Sports Arena: Valley View Casino Center
Valley View Casino Center is Geary Floors’ most decorated basketball court to date. The portable basketball court was completed in early February 2016 for the Harlem Globetrotter’s 90th anniversary world tour event. Customer: San Diego [...]
We’re Ready to Stand Behind,
What You’re Going to Stand On!